Green O Construction

Sherwood, Oregon · Additions & ADUs

Additions & ADUs in Sherwood, OR — built by your veteran-owned neighbor.

Quick drive from our Beaverton office. We know Washington County permit cycles and what local zoning will and won't allow. Bilingual EN/ES crews on every site.

Call (971) 226-7751Free walkthrough →

Why Sherwood homeowners hire us for additions & adus.

Additions and ADUs die in pre-construction - drawings stall, the engineer can't be reached, the permit gets bounced for something the architect should've caught. You wanted a guest suite for your mother-in-law. You got a six-month delay and a stalled hole. You deserve a contractor who keeps the architect, the engineer, the permit, and the crew under one roof - literally on the same payroll - so the project actually moves on a calendar you can plan around.

What you get when you hire us for additions & adus in Sherwood.

  • Free lot feasibility check - setbacks, height, lot coverage, easements - drawings yours to keep
  • Architect-stamped drawings produced in-house (no outside firm waiting list)
  • Structural PE on retainer - 3 partner firms, parallel quotes when speed matters
  • Permit applications submitted by us, inspections coordinated, red-tags handled
  • Excavation + foundation by our own crew (we own the excavators - no rental delays)
  • Framing, MEP rough-in, finish - all under one schedule, one PM
  • 17 years of Beaverton + Portland + Hillsboro + Tigard ADU permitting experience

Additions & ADUs in Sherwood — neighborhoods we've worked.

We're based in Beaverton with crews working Sherwood weekly. Quick drive from our office. We know Washington County permit cycles and what local zoning will and won't allow.

Old Town SherwoodSherwood Highlands

ZIP codes served: 97140

How additions & adus jobs run in Sherwood.

STEP 01

Free Feasibility

Free site visit + feasibility check (lot coverage, setbacks, height, sewer connection). You see whether it pencils BEFORE you pay for drawings.

STEP 02

Drawings + Permit

Architect-stamped drawings (in-house). Engineering coordinated. Permit pulled in our name. Site, tree, and neighbor protection plan.

STEP 03

One Schedule To CO

Excavation, foundation, framing, MEP rough-in, finish - all under ONE PM, ONE schedule. You call one number for the whole 5-7 months.

STEP 04

CO + Warranty In Your Name

Final inspection signed. Certificate of Occupancy in your hand. 10-year structural workmanship warranty, transferable to next owner.

Additions & ADUs in Sherwood — frequently asked questions.

How long does an ADU take?

Detached ADU typically 5-7 months from permit issue to CO. Permits themselves are 2-4 months in most jurisdictions. We give you a real calendar before you sign - not a hopeful guess.

Can you build an ADU on my Beaverton lot?

Beaverton allows ADUs in most R-zones. We do the lot feasibility for free as the first step - so you know whether it pencils before you commit a dollar.

Do you finance ADUs?

We don't lend, but we partner with Hearth + Service Finance Co for HELOC and construction-to-perm options.

Garage conversion - do I lose my garage?

Yes if it's a full conversion. Detached ADU keeps the garage. We help you compare both options in the free feasibility - no upsell.

What happens if I pick the wrong contractor?

Wrong contractor takes a deposit, files an incomplete permit application, the city bounces it, and you sit on a stalled lot. Or worse - they pour a foundation that doesn't meet setback and you face teardown. 17 years of Beaverton permitting means we know what the inspector will flag - before he flags it.

Can you build an ADU on my Beaverton or Portland lot?

Yes — ADUs are one of our most-requested adds. We handle the survey, design, permit, foundation, framing, MEP, and finish in-house. Architect on payroll keeps the design loop tight.

How long does an addition take, foundation to final?

Most residential additions run 4-7 months from permit to certificate of occupancy. We give you a written calendar, not a verbal guess.

Other services in Sherwood

Additions & ADUs in other cities

Free inspection — no obligation, written report yours to keep

Probably not the right move if you want the cheapest bid.

If you want this done once — by a CCB-licensed local who'll still answer the phone in year seven — we reply to every web inquiry inside 15 minutes during business hours (Mon–Sat 8 AM–7 PM PT). Storm damage or active leak? Call (971) 226-7751 — same-day callback.

No spam. No share. By submitting you agree to be contacted by Green O Construction.

Direct line

(971) 226-7751

Hours

Mon–Sat
8 AM – 7 PM PT

Office

20001 SW Tualatin Valley Hwy
Suite 208
Beaverton, OR 97006

Storm Response

24-hour callback
365 days/year