You need more space - but you don't want to move and you've heard ADU horror stories.

Permits stall. Drawings sit. The engineer doesn't return calls. Six months in, you've spent money and have a hole in the yard. Here's the plan: (1) free lot feasibility check (setbacks, height, lot coverage), (2) architect-stamped drawings produced in-house, (3) one PM from excavation through CO. Architect on our payroll, 3 PE engineering partners on retainer, owned excavators. 17 years in Beaverton - 4.3 stars - 51 reviews.

The problem

Why most jobs like this go sideways.

Additions and ADUs die in pre-construction - drawings stall, the engineer can't be reached, the permit gets bounced for something the architect should've caught. You wanted a guest suite for your mother-in-law. You got a six-month delay and a stalled hole. You deserve a contractor who keeps the architect, the engineer, the permit, and the crew under one roof - literally on the same payroll - so the project actually moves on a calendar you can plan around.

Included scope

In writing, before you sign anything.

Detached ADU

400-800 sq ft. Architect drawings + foundation + finish.

Home Addition

Bump-out, second story, primary suite. Engineered.

Garage Conversion

Detached + attached. Insulation, HVAC, finish.

What you get

What lands in your file when we're done.

  • Free lot feasibility check - setbacks, height, lot coverage, easements - drawings yours to keep
  • Architect-stamped drawings produced in-house (no outside firm waiting list)
  • Structural PE on retainer - 3 partner firms, parallel quotes when speed matters
  • Permit applications submitted by us, inspections coordinated, red-tags handled
  • Excavation + foundation by our own crew (we own the excavators - no rental delays)
  • Framing, MEP rough-in, finish - all under one schedule, one PM
  • 17 years of Beaverton + Portland + Hillsboro + Tigard ADU permitting experience

How we work

How we run it.

01

Free Feasibility

Free site visit + feasibility check (lot coverage, setbacks, height, sewer connection). You see whether it pencils BEFORE you pay for drawings.

02

Drawings + Permit

Architect-stamped drawings (in-house). Engineering coordinated. Permit pulled in our name. Site, tree, and neighbor protection plan.

03

One Schedule To CO

Excavation, foundation, framing, MEP rough-in, finish - all under ONE PM, ONE schedule. You call one number for the whole 5-7 months.

04

CO + Warranty In Your Name

Final inspection signed. Certificate of Occupancy in your hand. 10-year structural workmanship warranty, transferable to next owner.

Questions, answered

Frequently asked.

How long does an ADU take?

Detached ADU typically 5-7 months from permit issue to CO. Permits themselves are 2-4 months in most jurisdictions. We give you a real calendar before you sign - not a hopeful guess.

Can you build an ADU on my Beaverton lot?

Beaverton allows ADUs in most R-zones. We do the lot feasibility for free as the first step - so you know whether it pencils before you commit a dollar.

Do you finance ADUs?

We don't lend, but we partner with Hearth + Service Finance Co for HELOC and construction-to-perm options.

Garage conversion - do I lose my garage?

Yes if it's a full conversion. Detached ADU keeps the garage. We help you compare both options in the free feasibility - no upsell.

What happens if I pick the wrong contractor?

Wrong contractor takes a deposit, files an incomplete permit application, the city bounces it, and you sit on a stalled lot. Or worse - they pour a foundation that doesn't meet setback and you face teardown. 17 years of Beaverton permitting means we know what the inspector will flag - before he flags it.

Can you build an ADU on my Beaverton or Portland lot?

Yes — ADUs are one of our most-requested adds. We handle the survey, design, permit, foundation, framing, MEP, and finish in-house. Architect on payroll keeps the design loop tight.

How long does an addition take, foundation to final?

Most residential additions run 4-7 months from permit to certificate of occupancy. We give you a written calendar, not a verbal guess.

Where we work

Additions & ADUs across the Portland metro

Twelve cities. One CCB-licensed crew that lives here. The contractor in your driveway with the out-of-state plate will be gone by next storm — we're still answering the phone in year seven. Tap any city for local proof, response times, and the ZIPs we cover.

Additions & ADUs in BeavertonAdditions & ADUs in PortlandAdditions & ADUs in HillsboroAdditions & ADUs in TigardAdditions & ADUs in TualatinAdditions & ADUs in AlohaAdditions & ADUs in SherwoodAdditions & ADUs in WilsonvilleAdditions & ADUs in CorneliusAdditions & ADUs in Forest GroveAdditions & ADUs in Lake OswegoAdditions & ADUs in West Linn

Topic cluster

Read deeper on additions & adus.

Beaverton ADU permits in 2026Veteran-owned construction, unpackedCase study: Mosaic Arts Loft ADU conversionADU Beaverton — permits to final

Free inspection — no obligation, written report yours to keep

Probably not the right move if you want the cheapest bid.

If you want this done once — by a CCB-licensed local who'll still answer the phone in year seven — we reply to every web inquiry inside 15 minutes during business hours (Mon–Sat 8 AM–7 PM PT). Storm damage or active leak? Call (971) 226-7751 — same-day callback.

No spam. No share. By submitting you agree to be contacted by Green O Construction.

Direct line

(971) 226-7751

Hours

Mon–Sat
8 AM – 7 PM PT

Office

20001 SW Tualatin Valley Hwy
Suite 208
Beaverton, OR 97006

Storm Response

24-hour callback
365 days/year